Regulatory inspection readiness and support

Inspections are not won in the week before they start. They are won by knowing your own weaknesses before the inspector does, and by having a plan for them. We prepare sites, we sit with you during the inspection, and we help you write the response afterwards.

What we provide

Readiness assessment

A gap assessment against the likely inspection scope, with the findings you should expect and how to answer them.

Mock inspection

A rehearsal under realistic conditions, including document requests, floor tours and staff interviews.

On site support

Back room coordination and daily wrap ups during the inspection itself.

Response and commitments

Drafting the response letter, building the CAPA plan and tracking commitments to closure.

Preparing properly

Preparation starts with an honest gap assessment. There is very little value in a readiness exercise that concludes everything is fine, because inspectors will find something and the site will be unprepared for the conversation.

From the gap assessment we build three things. A prioritised list of what can realistically be closed before the inspection, and what cannot. A clear position on each known weakness, meaning what the issue is, what you have already done about it and what is planned, because a weakness with a plan attached is a different conversation from a weakness discovered cold. And a document readiness check, since a large proportion of avoidable findings come from records that exist but cannot be produced within the time an inspector is willing to wait.

Front room and back room

Most sites underestimate the back room. It is the function that receives a request, finds the document, checks it before it is handed over, logs what was provided and to whom, and feeds that back to the front room so the same subject is not answered two different ways on two different days.

Where the back room is weak, the inspection generates findings that have nothing to do with the quality of the operation and everything to do with the handling of the inspection. That is the most frustrating category of finding, because it is entirely preventable.

Coaching the people who will be interviewed

Operators and analysts are rarely the problem. The problem is that they have not been told what is expected of them, so they guess. Two rules cover most of it. Answer the question that was asked, and nothing further. If you do not know, say that you do not know and name the person who does.

We run practice interviews because the difference between being told this and having done it once is substantial. The aim is not to script people, which is transparent and damaging, but to remove the anxiety that makes them volunteer information they are not sure about.

After the inspection

The response is where good sites lose ground. Two failures are common. Committing to more than can be delivered, which converts a closed finding into a broken commitment at the next inspection. And responding to the symptom rather than the finding, which produces a follow up letter and a longer engagement with the authority than anyone wanted.

We draft responses that address the underlying issue, commit to dates the site can actually meet, and are written in a form the receiving authority expects. We then track the commitments, because the most avoidable finding of all is a commitment from the last inspection that quietly slipped.

How we work

1. Gap assessment

An honest picture of what an inspector will find, three to six months out if possible.

2. Close and prepare

Remediation of what can be fixed, and a documented position on what cannot.

3. Rehearse

Mock inspection with document requests, floor tours and interview practice.

4. Support and respond

On site during the inspection, then response drafting and commitment tracking afterwards.

Common questions

How far in advance should we start?

Three to six months is comfortable and allows real remediation. Six weeks is workable and focuses on the defensible position rather than a rebuild. Two weeks is triage, and we will tell you plainly what can and cannot be achieved.

Do you attend the inspection itself?

Yes, usually in the back room. We do not represent the company in front of the inspector, because your own people must be able to answer for their own system. A consultant answering on behalf of the site is itself a signal.

We are in an inspection right now. Can you help?

Sometimes, for back room support and response drafting. Call rather than email if this is the situation.

Can you help with the response letter only?

Yes. This is a common request and it is good value, because the response letter has a long life. It is read again at the next inspection.

Does this apply to customer audits as well?

Yes. The preparation is much the same, although customer audits have a commercial dimension that regulatory inspections do not. We prepare sites for both.

Speak with a GMP specialist

If you have a date, tell us what it is and which authority is coming. We will tell you what is realistically achievable in the time available.